00 hr RUC cross section of frontogenesis, negative EPV and omega valid 10/25 18z.

RUC cross section

Slide Links:

Speaker Notes:

Cross sections showed the same things as the plan view charts – A good banding signature was in place at 18z on the 25th.

Text Mostly Version